PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installed copper piping for the radiant panels at the 4th floor Facing East.jpg Installed junction boxes at 1st floor cmu wall Facing North-East.jpg Laying out block at Elevator 5,6 divider wall Facing North.jpg Continued sheathing and installing insulation at the parapet (South Elevation).jpg Installed roofing membrane at the lower roof Facing North.jpg
Previous page Installed roofing membrane at the lower roof Facing North
Installed roofing membrane at the lower roof Facing North